Projects

Project picture
Project name:Peking University International Hospital distributed PV power project
Location:Beijing
Installed capacity:582kW

The total installed capacity of the distributed PV power station is 582.32 kilowatts. The station adopts the operation model of "power generation for self use with surplus power transferred to the grid" and carries out energy management contracting with Peking University International Hospital. The station uses Hanergy's leading Solibro series CIGS modules and has two application models: a rooftop PV power station and PV carport with charging pile. The entire project was independently developed by Hanergy, and completed by the end of March 2017.